[1.3.1
**************************************************************************
NOTE:
Use for projects which use EFA Northwest
regional Section 01525, "Safety Requirements"."
**************************************************************************
specified in EFA Northwest regional Section 01525 SAFETY REQUIREMENTS.
]]1.4
Certification of EPA Designated Items
Submit the Certification of EPA Designated Items as required by FAR
52.223-9, "Certification and Estimate of Percentage of Recovered Material
Content for EPA Designated Items".
1.5
PROJECT RECORD DOCUMENTS
**************************************************************************
NOTE: Include the first bracketed sentence on all
SOUTHWESTNAVFACENGCOM projects.
**************************************************************************
**************************************************************************
NOTE: Delete the next two paragraphs, "Record
Drawings" and "Utility Record Drawings", on Design
Build projects.
**************************************************************************
1.5.1
As-Built Drawings
"FAC 5252.236-9310, Record Drawings." [In addition to the requirements of
FAC 5252.236-9310, the Contractor shall survey the horizontal and vertical
location of all underground utilities to within 30 mm 0.1 feet[_____]
relative to the station datum. All pipe utilities shall be surveyed at
each fitting and every 10 m 100 LF [_____] of run length. Electrical and
communication ductbank, direct buried conduit, and direct buried conductor
shall be surveyed every 10 m 100 LF [_____] and at each change of
direction. Locations and elevations shall be recorded on the Record
Drawings. Submit drawings with QC certification.] [Submit drawings in
[_____] CAD format.] [As-Built Drawings are not required.]
1.5.2
Utility Record Drawings
**************************************************************************
NOTE: Include requirement for "Record Drawings" in
all projects in SOUTHWESTNAVFACENGCOM regional area
that include underground utilities.
**************************************************************************
In addition to record drawings provide for each exterior utility system a
set of reproducible utility drawings, stamped and signed by a registered
professional civil engineer or professional land surveyor, and two copies.
Submit within ten working days after each system is in place, but no later
than five working days before final inspection. Indicate exterior
utilities from a point five feet from a building to the termination point
or point of connection to existing system. Include the following:
SECTION 01770N
Page 5